Clients / NDIA Steering Committee

VVIP Car park for Emiri Terminal at HIA

The VVIP car park was constructed beside the Emiri Terminal. It consists of 700 tons of steel works with GRI louvers installed on roof. The project was completed in 3 months.

Client : NDIA Steering Committee

Consultant : HOK

Contractor : Bechtel, Qatar.

Our scope of work : Erection of 700 tons of steel works and installation of louvers for VVIP car park at Emiri Terminal The VVIP car park was constructed beside the Emiri Terminal. It consists of 700 tons of steel works with GRI louvers installed on roof. The project was completed in 3 months.